VMware Data Center to AWS: A Workload-by-Workload Migration Strategy
Industrial manufacturing case study: 186 VMs, 72 TB, 40+ applications, six controlled migration waves, and 30% lower three-year infrastructure TCO.
•
4 min read
Industrial manufacturing case study: 186 VMs, 72 TB, 40+ applications, six controlled migration waves, and 30% lower three-year infrastructure TCO.
B2B software case study: selective modernization across 120 VMware workloads, with EC2, containers, managed databases, retirement, and retained systems.
Hybrid operations case study: AAIC SRE ownership, phased migration handover, recovery controls, and OpsRabbit-assisted investigations across cloud and retained systems.